Columbia Basin Trust

You can browse the library by Topic, Collection, Creator, or Date simply by clicking the tabs across this page. To sort results, click on Title, Date, or Creator. Can't find what you're looking for? Try the Advanced Search feature. Need more assistance? Please visit the Help Page for detailed instructions and a short Video Tutorial on how to browse, sort and search the library.

Refine Your Search
Title & Description Date Creator Topic

Annual reports submitted to Ottawa and Washington D.C. from 1980 to 1989. These reports discuss Entity studies, project construction, and operation of the Arrow, Duncan, Mica and Libby Reservoirs. Illustrated with maps and charts. The 1981 report is…

1980 - 1989

Columbia River Treaty Permanent Engineering Board

Annual reports submitted to Ottawa and Washington D.C. from 1965 to 1969. These reports describe progress on construction and studies pertaining to the Treaty, and the benefits of the operation of Duncan Dam and Arrow Dam.

1965 - 1969

Columbia River Treaty Permanent Engineering Board

Annual reports submitted to Ottawa and Washington D.C. from 1970 to 1979. Discusses Entity studies, project construction, and operation of the Arrow, Duncan, Mica and Libby Reservoirs. Illustrated with maps and charts.

1970 - 1979

Columbia River Treaty Permanent Engineering Board

Annual reports submitted to Ottawa and Washington D.C. from 1990 to 1999. These reports discuss Entity studies, project construction, and operation of the Arrow, Duncan, Mica and Libby Reservoirs. Illustrated with maps and charts. The 1991 report is…

1990 - 1999

Columbia River Treaty Permanent Engineering Board

Annual reports submitted to Ottawa and Washington D.C. from 2000 to 2009. These reports discuss Entity studies, project construction, and operation of the Arrow, Duncan, Mica and Libby Reservoirs. Illustrated with maps and charts. The 2006 report is…

2000 - 2009

Columbia River Treaty Permanent Engineering Board

Series contains annual reports submitted by the Permanent Engineering Board in accordance with the Treaty. Reports have been grouped by decade. To view the individual reports, please click on the links listed under "Has Part."

1965 - 2008

Columbia River Treaty Permanent Engineering Board

"The purpose of this paper is to develop and apply a methodology to determine the marginal economic costs of supplying electricity in the predominantly hydro-electric system of the British Columbia Hydro and Power Authority (B.C. Hydro). This…

1977

Osler, Sanford Lake

Testimony from International Joint Commission (IJC) hearings on the United States' application for the Grand Coulee Dam, as held in Spokane, Washington on February 28, 1941.

1941-02-28

International Joint Commission

This website provides audio and text of the announcement of the 2007 agreement between First Nations and US Federal agencies regarding fish in the Columbia River Basin. The parties involved include the Confederated Tribes of the Umatilla Indian…

2007

Columbia River Inter-Tribal Fish Commission

Artist's conception of Arrow Dam (later renamed Keenleyside Dam). Date unknown.

Unknown

United States. Bonneville Power Administration

Columbia Basin Trust supports efforts by the people of the Basin to create a legacy of social, economic
and environmental well-being and to achieve greater self-sufficiency for present and future generations.
1.800.505.8998